Showing posts with label Endeavour. Show all posts
Showing posts with label Endeavour. Show all posts

Tuesday, 26 January 2010

Endeavour, Pad and Crew Preps Continue

Endeavour, Pad and Crew Preps Continue


Mon, 25 Jan 2010 08:12:19 -0600

At NASA Kennedy Space Center's Launch Pad 39A, workers closed space shuttle Endeavour's payload bay doors for flight during the weekend.

Pad maintenance and checks will be conducted until launch day, which is targeted for Feb. 7 at 4:39 a.m. EST.

The six STS-130 mission astronauts will review flight data and practice in-flight maintenance procedures today at NASA's Johnson Space Center in Houston.

At the conclusion of the executive-level Flight Readiness Review that will be held at Kennedy on Jan. 27, the official launch date will be announced during a press briefing.

Thursday, 3 December 2009

Endeavour, Crew Prep for STS-130 On-going

Endeavour, Crew Prep for STS-130 On-going


Wed, 02 Dec 2009 09:52:58 -0600

Technicians in Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida are preparing space shuttle Endeavour for its move to the Vehicle Assembly Building on Dec. 12.

Throughout the next three days, they'll leak test Endeavour's environmental control and life support system. Techs also are testing the space shuttle main engine and aerosurface hydraulics, as well as testing and calibrating the Inertial Measurement Units, or IMUs, which provide navigational information for the shuttle while it's in orbit.

Meanwhile, Endeavour's STS-130 astronauts ‪are practicing an integrated launch simulation today at NASA's Johnson Space Center in Houston.